Period
2008–2011
Client
Karaj Urban and Suburban Railway Organization
Location
Starting from Bagestan in northwest Karaj, passing through Golshahr 45-meter Avenue, Golzar-e-Gharbi Street, and Imam Khomeini Boulevard in Mehrshahr, extending to Payam Airport in southwest Karaj.
Stage
Completion of Phase I – Studies and Design
Technical Specifications:
• Total length: 18 km (17 km underground tunnel).
• Number of stations: 19, connecting northwest to southwest Karaj.
• Intersections with Karaj Metro Lines 1, 2, and 3.
Role of Moshanir
• Project Manager (MC).
Special Achievements
• 17 underground stations (out of 19 total).
• One depot and terminal complex located at the southern end of the line.
• One parking facility planned at the northern end of the line.
• 24 trainsets required, each with a capacity of 1,500 passengers.
• Train headway: 2 minutes and 30 seconds.
• Final passenger capacity: 35,700 passengers per hour per direction.