Environmental Impact Assessment (EIA) – Vanak Dam and Irrigation Network Project

Environmental Impact Assessment (EIA) – Vanak Dam and Irrigation Network Project

Period 2010–2014
Client Chaharmahal and Bakhtiari Regional Water Company
Location Chaharmahal and Bakhtiari Province
Stage Preparation and submission of final report

Technical Specifications:

•    Dam type: Earth-rockfill dam with clay core
•    Height: 64.5 m
•    Normal operating level: 2,100 m above sea level
•    Water transfer system: Designed to convey water from the reservoir to adjacent plains for:
•    Supplying part of drinking and industrial water needs
•    Strengthening the aquifer of Khan Mirza Plain

Role of Moshanir

•    Consultant for obtaining the environmental permit of the project.

Special Achievements

•    Expansion of irrigated agricultural lands in the plains adjacent to Vanak Dam.