Period
2010–2012
Client
Almahdi Aluminum Company
Location
Bandar Abbas City
Stage
Project Completion
Technical Specifications:
• Construction of a 1,106.5 MW combined-cycle power plant planned to supply electricity demand for Almahdi Aluminum Company.
• To maximize use of existing infrastructure and reduce ancillary costs, the plant was designed to be built within the premises of Almahdi Aluminum facilities.
Role of Moshanir
• Conducted studies to identify, review, and evaluate both positive and negative environmental impacts of the project.
• Proposed mitigation measures to minimize adverse impacts and enhance positive effects during construction and operation.
• Submitted the EIA report to the Environmental Assessment Office for approval by the Department of Environment, enabling the commencement of construction activities upon permit issuance.
Special Achievements
• Applied specialized expertise in environmental sciences, air pollution, and ecology.