Environmental Impact Assessment (EIA) – Almahdi Aluminum Combined-Cycle Power Plant

Environmental Impact Assessment (EIA) – Almahdi Aluminum Combined-Cycle Power Plant

Period 2010–2012
Client Almahdi Aluminum Company
Location Bandar Abbas City
Stage Project Completion

Technical Specifications:

•    Construction of a 1,106.5 MW combined-cycle power plant planned to supply electricity demand for Almahdi Aluminum Company.
•    To maximize use of existing infrastructure and reduce ancillary costs, the plant was designed to be built within the premises of Almahdi Aluminum facilities.
Role of Moshanir
•    Conducted studies to identify, review, and evaluate both positive and negative environmental impacts of the project.
•    Proposed mitigation measures to minimize adverse impacts and enhance positive effects during construction and operation.
•    Submitted the EIA report to the Environmental Assessment Office for approval by the Department of Environment, enabling the commencement of construction activities upon permit issuance.
Special Achievements
•    Applied specialized expertise in environmental sciences, air pollution, and ecology.