Dez Power Plant Equipment Optimization

Dez Power Plant Equipment Optimization

Period October 2006
Client Khuzestan Water and Power Authority
Location Dez Dam and Power Plant, 25 km northeast of Dezful and Andimeshk
Stage Execution Phase

Technical Specifications:

•    Optimization of electromechanical and hydromechanical equipment of Dez Dam Power Plant.

Role of Moshanir

•    Stage III services including high-level supervision, design review and approval, supervision of construction, installation, and commissioning.

Special Achievements

•    Dez Dam Power Plant consists of 8 units, each originally rated at 65 MW.
•    Following equipment optimization, the capacity of each unit increased to 90 MW.
•    As a result, the total output of the power plant rose from 520 MW to 720 MW.