Period
1994–2009
Client
Hormozgan Regional Water Company
Location
70 km from Bandar Abbas towards Minab
Stage
Final Handover
Technical Specifications:
• Purpose: Flood control and water storage for agricultural use.
• Type: Earthfill dam with clay core.
• Height: 32.3 m
• Crest length: 1,200 m
• Intake system: Surface intake and deep outlet.
• Additional facilities: Groundwater pumping station upstream of the dam.
Role of Moshanir
Provision of services for all stages including studies, design, and supervision.