Period
1996–1998
Client
Ministry of Energy, Lebanon
Location
Lebanon
Stage
Final delivery
Technical Specifications
• Two mobile substations rated at 20/133 kV
• Each equipped with a 15 MVA power transformer
Moshanir responsibility:
Moshanir provided engineering services during the construction phase of the mobile substations, up to installation and commissioning at site.
Key Achievements
• Successful delivery of mobile substations to enhance Lebanon’s power transmission capacity
• Strengthened international collaboration in the field of mobile substation engineering and deployment