Design and Supply of Two Mobile Substations – Lebanon

Design and Supply of Two Mobile Substations – Lebanon

Period 1996–1998
Client Ministry of Energy, Lebanon
Location Lebanon
Stage Final delivery

Technical Specifications

•    Two mobile substations rated at 20/133 kV
•    Each equipped with a 15 MVA power transformer

Moshanir responsibility:

Moshanir provided engineering services during the construction phase of the mobile substations, up to installation and commissioning at site.

Key Achievements

•    Successful delivery of mobile substations to enhance Lebanon’s power transmission capacity
•    Strengthened international collaboration in the field of mobile substation engineering and deployment