Period
2009–2013
Client
Iran Water and Power Resources Development Company
Location
Dareh Shahr
Stage
Installation, testing, and commissioning
Technical Specifications
• GIS and DCS type substation
• Double busbar arrangement with bypass disconnector
• 3 power plant feeders and 6 line feeders
• Transformer-to-substation connection via overhead busbar
• EPC contract framework
Moshanir responsibility:
Moshanir was responsible for:
• Design review
• Site supervision during installation, testing, and commissioning
• Oversight of provisional and final handover
Key Achievements
• Deployment of advanced GIS and DCS technologies in a hydropower plant substation
• Ensured compliance with EPC standards and quality assurance during commissioning
• Strengthened reliability of power evacuation from Simareh hydropower plant