Period
2010–2013
Client
Iran Power Grid Management Company
Location
Nationwide (various sites across the country)
Stage
Provisional delivery
Technical Specifications
• In the first phase, 26 PMUs were installed at different locations across the country as a pilot project, with the Tehran Control Center defined as the central hub.
• The collection and processing of these synchronized measurements established the foundation for a new and relatively advanced technology for monitoring, protection, and control of power networks.
Moshanir responsibility:
Moshanir was responsible for:
• High-level and site supervision of the Phase II synchronized phasor measurement system
Key Achievements
• Pilot implementation of PMU technology in Iran’s power grid
• Establishment of a modern monitoring and protection framework for future nationwide deployment
• Anticipated transition toward full grid control and protection using PMU systems