Period
2013–2014
Client
Iran Water and Power Resources Development Company
Location
Paveh city
Stage
Design review
Technical Specifications
- Double busbar arrangement with bypass disconnector
- Three 230 kV transformer feeders
- Two 230 kV outgoing line feeders
- One coupler feeder
Moshanir responsibility:
Moshanir was responsible for:
- Design review
- Preparation of tender documents
- Organizing tenders
- Contracting with contractors
Key Achievements
- Strengthened transmission infrastructure in western Iran
- Enhanced reliability of regional power supply through modern substation design