Technical Specifications
• Substation type: DCS and GIS
• 765 kV section:
o One line feeder
o Three transformer feeders in 1½ breaker scheme
• 400 kV section:
o Four line feeders
o Three transformer feeders in 1½ breaker scheme
• Three 400/765 kV power transformers
Moshanir responsibility:
Moshanir was responsible for:
• Preliminary studies
• Preparation of tender documents
• Organizing tenders and contracting with contractors
• Design review
• Site supervision
• Oversight of provisional and final handover
Key Achievements
• Implementation of 765 kV transmission lines and systems to reduce network transmission losses
• Introduction of extra-high voltage technology to enhance efficiency and reliability of the national grid