Period
2005–2013
Client
Bakhtar Regional Electricity Company
Location
50 km after Arak, on Shazand Road
Stage
Near energization
Technical Specifications
• 400 kV section:
o 1½ breaker scheme (near busbar arrangement)
o Four main line feeders + two Extension feeders
o Two unnamed feeders
o Two transformer feeders + two Extension transformer feeders
• 230 kV section:
o Double busbar arrangement
o One coupler feeder
o Eight line feeders + four Extension line feeders
o Two Extension transformer feeders
• Two shunt reactors and two neutral reactors
• Two 200 MVA power transformers
• Substation control system: DCS
Moshanir responsibility:
Moshanir provided:
• Engineering services (Phases I, II, III-a, and III-b)
• Site supervision of civil works and equipment installation
Key Achievements
• Strengthened transmission infrastructure in the Arak–Shazand corridor
• Deployment of advanced DCS control system for improved monitoring and reliability
• Flexible design enabling staged Extension at both 400 kV and 230 kV levels