Period
2013–2014
Client
Saba Steel Persian Gulf Company
Location
Hormozgan Province, 40 km from Bandar Abbas
Stage
Equipment procurement and civil works execution
Technical Specifications
• Two 230 kV overhead line feeders
• Three 230 kV feeders for one 80 MVA 33/230 kV transformer
• Two 200 MVA 33/230 kV transformers
• One 230 kV bus coupler feeder
• One 33 kV incoming feeder for the 80 MVA transformer
• Two 33 kV incoming feeders for the 200 MVA transformers
• 33 kV switchgear with three incoming feeders and seven outgoing feeders
Moshanir responsibility:
Moshanir provided Project Management Consultancy (PMC) and site supervision services, including:
• Preliminary design and preparation of overall project specifications
• Detailed design and technical specifications
• Preparation and organization of tender documents for equipment procurement
• Technical and financial evaluation of proposals
• Contract drafting and compliance review
• Inspection and supervision under PMC scope, covering design completion, procurement, civil works, installation, testing, and commissioning
Key Achievements
• Construction of a GIS substation dedicated to steel industry applications
• Strengthened industrial electrification infrastructure in Hormozgan Province
• Enhanced reliability and efficiency of power supply for large-scale steel production