Shahid Samaei 63/400 kV Substation

Shahid Samaei 63/400 kV Substation

Period 2008–2014
Client Yazd Regional Electricity Company
Location Khazrabad, Yazd County
Stage Civil works and installation in progress

Technical Specifications

•    400 kV section:
o    Four feeders: one incoming line feeder, one outgoing line feeder, and two transformer feeders
o    Incomplete 1½ breaker scheme arrangement
•    63 kV section:
o    Ten feeders in single busbar arrangement
o    One coupler switch
o    Two transformer bays with total capacity of 2 × 200 MVA
•    Control and communication systems:
•    SCADA, PLC, and dispatching equipment
•    Substation control system: DCS

Moshanir responsibility:

Moshanir provided engineering and site supervision services across phases I, II, and III, including:
•    Load flow studies
•    Short-circuit current calculations
•    Preparation of single-line diagrams, layouts, and sections
•    Architectural, structural, and foundation design for control and guard buildings
•    Single-line protection and control diagrams (AC and DC systems)
•    Preparation of tender documents
•    Technical and financial evaluation of proposals
•    Drafting of contract documents
•    Ensuring compliance of design with technical specifications and contractual requirements

Key Achievements

•    Deployment of advanced SCADA and DCS systems for enhanced monitoring and control
•    Strengthened transmission infrastructure in Yazd region through integration of 400 kV and 63 kV levels