Period
2006–2014
Client
Sanir Company
Location
Armenia
Stage
Phase I completed (project design finalized, partial equipment procurement completed)
Technical Specifications
• 285 km double-circuit, twin-conductor 400 kV transmission line
• One 220/400 kV substation
• Transmission line includes 740 towers with an approximate total weight of 22,000 tons
• Insulators used: glass type, rated 210/160/120 kN
Moshanir responsibility:
Moshanir served as:
• Project consultant and designer
• Supervisor of all contractors’ performance throughout the project
Key Achievements
• Strengthened Armenia’s transmission infrastructure with a modern 400 kV double-circuit line
• Deployment of heavy-duty lattice towers and high-strength glass insulators for reliability
• Enhanced regional power exchange capacity through integration of 220/400 kV substation facilities