Period
2006–2009
Client
Sanir Company
Location
Republic of Azerbaijan
Stage
Final delivery
Technical Specifications
• Two transmission lines at 330 kV and 220 kV, with a total length of 330 km
• Construction of two 330 kV substations and one 220 kV substation
• Extension of two existing 220 kV substations
Moshanir responsibility:
Moshanir was responsible for:
• Complete project design based on Russian standards (GOST)
• Supervision of project execution
• Coordination between contractors and the client
Key Achievements
• First project in the company fully designed according to Russian GOST standards
• Acquisition of technical expertise in transmission line design under Russian engineering codes
• Strengthened regional transmission infrastructure through integration of 330 kV and 220 kV systems