Azerbaijan 330 & 220 kV Transmission Lines and Substations

Azerbaijan 330 & 220 kV Transmission Lines and Substations

Period 2006–2009
Client Sanir Company
Location Republic of Azerbaijan
Stage Final delivery

Technical Specifications

•    Two transmission lines at 330 kV and 220 kV, with a total length of 330 km
•    Construction of two 330 kV substations and one 220 kV substation
•    Extension of two existing 220 kV substations

Moshanir responsibility:

Moshanir was responsible for:
•    Complete project design based on Russian standards (GOST)
•    Supervision of project execution
•    Coordination between contractors and the client

Key Achievements

•    First project in the company fully designed according to Russian GOST standards
•    Acquisition of technical expertise in transmission line design under Russian engineering codes
•    Strengthened regional transmission infrastructure through integration of 330 kV and 220 kV systems