Technical Assistance Project for Experts of the Syrian Ministry of Electricity

Technical Assistance Project for Experts of the Syrian Ministry of Electricity

Period 2001–2002
Client Syrian Electric Power Generation and Transmission Company
Location Syria
Stage Final delivery

Technical Specifications

•    Design of 230/400 kV transmission lines and substations in Syria
•    Supervision of ongoing Syrian projects, including the 400 kV interconnection line between Turkey and Syria

Moshanir responsibility:

Moshanir was responsible for:
•    Project design
•    Supervision of implementation

Key Achievements

•    Collaboration between Moshanir experts and Syrian engineers
•    Provision of engineering services and training for Syrian specialists
•    Preparation of educational manuals as part of knowledge transfer
•    Direct familiarization of Syrian electricity authorities with Moshanir’s technical capabilities