Period
2001–2002
Client
Syrian Electric Power Generation and Transmission Company
Location
Syria
Stage
Final delivery
Technical Specifications
• Design of 230/400 kV transmission lines and substations in Syria
• Supervision of ongoing Syrian projects, including the 400 kV interconnection line between Turkey and Syria
Moshanir responsibility:
Moshanir was responsible for:
• Project design
• Supervision of implementation
Key Achievements
• Collaboration between Moshanir experts and Syrian engineers
• Provision of engineering services and training for Syrian specialists
• Preparation of educational manuals as part of knowledge transfer
• Direct familiarization of Syrian electricity authorities with Moshanir’s technical capabilities