Iran–Dubai Power Grid Interconnection via 500 kV Submarine Cable

Iran–Dubai Power Grid Interconnection via 500 kV Submarine Cable

Period 2007–2008
Client Tavanir Company – DEWA (Dubai Electricity and Water Authority)
Location Iran – Dubai
Stage Final delivery

Technical Specifications

•    Feasibility study for transferring 1,500 MW from Iran’s national grid to Dubai
•    Transmission through ±500 kV submarine cable using HVDC technology
Moshanir responsibility:
Moshanir acted as consultant to the Iranian party of the project (Tavanir), providing engineering and advisory services.

Key Achievements

•    Mutual familiarization of both companies with the capabilities of each other’s power networks (particularly DEWA with Iran’s electricity industry)
•    Valuable experience gained by Iranian experts, especially Moshanir, in project management and engineering services for cross-border projects
•    Enhanced expertise in HVDC systems and submarine transmission technologies