Qastoun–Ain al-Zarqa 66 kV Transmission Line

Qastoun–Ain al-Zarqa 66 kV Transmission Line

Period 2003–2005
Client Syrian Ministry of Electricity
Location Syria
Stage Final delivery

Technical Specifications

•    Design of a 30 km double-circuit 66 kV transmission line between Qastoun and Ain al-Zarqa substations
•    Spotting performed using computer software
•    Preparation of technical specifications and Volume II of tender documents for procurement and project execution
•    Training of client’s engineers
•    Sale of Moshanir’s proprietary design and spotting software to the client

Moshanir responsibility:

Moshanir was responsible for:
•    Project design
•    Provision of engineering services

Key Achievements

•    The project provided an effective platform for Syrian electricity officials and engineers to become familiar with Moshanir’s capabilities and domestic manufacturing potential in transmission line equipment
•    Strengthened confidence of the Syrian Ministry of Electricity in Moshanir, paving the way for future cooperation