Period
2003–2005
Client
Syrian Ministry of Electricity
Location
Syria
Stage
Final delivery
Technical Specifications
• Design of a 30 km double-circuit 66 kV transmission line between Qastoun and Ain al-Zarqa substations
• Spotting performed using computer software
• Preparation of technical specifications and Volume II of tender documents for procurement and project execution
• Training of client’s engineers
• Sale of Moshanir’s proprietary design and spotting software to the client
Moshanir responsibility:
Moshanir was responsible for:
• Project design
• Provision of engineering services
Key Achievements
• The project provided an effective platform for Syrian electricity officials and engineers to become familiar with Moshanir’s capabilities and domestic manufacturing potential in transmission line equipment
• Strengthened confidence of the Syrian Ministry of Electricity in Moshanir, paving the way for future cooperation