Period
2006–2008
Client
SJSC Uzbekenergo
Location
Uzbekistan
Stage
Final delivery
Technical Specifications
• Single-circuit 500 kV transmission line
• Guyed-type lattice towers with composite insulators
• Line length: 200 km
• Power transmission from the large Syrdarya Power Plant to the 500/220 kV Sogdiana substation near Samarkand
• Extension of 500 kV substations at both ends (Syrdarya Power Plant and Sogdiana region)
Moshanir responsibility:
Moshanir provided engineering services across phases I, II, and III, including:
• Route survey and collection of preliminary project data
• Preparation of technical specifications for required equipment
• Drafting and organization of tender documents (technical and commercial) for line and substation equipment, conducted in multiple rounds
• Continuous coordination with project financiers to comply with bank guidelines
• Ongoing communication with the client (Uzbekenergo) during document preparation and submission of required reports
• Contract negotiations with contractors and manufacturers
• Drafting and finalization of contract documents
• Supervision of equipment testing, transportation, installation, and overall high-level project oversight
Key Achievements
• Successful implementation of a 500 kV transmission line connecting Syrdarya Power Plant to Sogdiana substation
• Strengthened Uzbekistan’s transmission infrastructure and regional energy reliability
• Deployment of composite insulator technology for improved performance and reduced maintenance requirements