Period
2006–2011
Client
Fars Regional Electricity Company
Location
Between Jahrom, Larstan, and Gerash counties
Stage
Provisional delivery
Technical Specifications
• Line length: approximately 167 km
• Route passes mainly through rugged mountainous terrain
• Entire project completed with a diverse combination of lattice towers adapted to site conditions
Moshanir responsibility:
Moshanir provided engineering services including:
• Route selection and surveying
• Preparation of plan and profile drawings
• Engineering studies
• Geological and geotechnical investigations
• Tower spotting and layout
• Preparation of tender documents and contracts for procurement and execution
Key Achievements
• Successful implementation of the project using a diverse mix of lattice towers, achieving the lowest possible cost among comparable transmission lines
• Despite the line being designed as a triple bundle conductor, tension insulator strings were applied in double configuration, optimizing cost and performance