Period
2005–2008
Client
Ministry of Energy and Steel, Nigeria
Location
Headquarters in Abuja; supervision teams based in Benin and Abor cities
Stage
Final delivery
Technical Specifications
• One 132 kV double circuit transmission line, 130 km in length
• Three 132/33 kV substations
• One 132/33 kV substation Extension
Moshanir responsibility:
Moshanir was introduced as:
• Consultant for project design
• Supervisor of contractor execution
• Initially involved in reviewing contractors’ tender documents
• Conducted technical review of contractor documentation
• Supervised project execution and participated in equipment testing for approval
Key Achievements
• In 2005, Nigeria’s National Integrated Power Project (NIPP) defined 21 lots (projects)
• Lot 8 was assigned to Moshanir, while other lots were awarded to leading international consultancy firms
• Moshanir received an appreciation certificate from the client for the quality of services provided