Nigeria High Voltage Transmission Lines and Substations

Nigeria High Voltage Transmission Lines and Substations

Period 2005–2008
Client Ministry of Energy and Steel, Nigeria
Location Headquarters in Abuja; supervision teams based in Benin and Abor cities
Stage Final delivery

Technical Specifications

•    One 132 kV double circuit transmission line, 130 km in length
•    Three 132/33 kV substations
•    One 132/33 kV substation Extension

Moshanir responsibility:

Moshanir was introduced as:
•    Consultant for project design
•    Supervisor of contractor execution
•    Initially involved in reviewing contractors’ tender documents
•    Conducted technical review of contractor documentation
•    Supervised project execution and participated in equipment testing for approval

Key Achievements

•    In 2005, Nigeria’s National Integrated Power Project (NIPP) defined 21 lots (projects)
•    Lot 8 was assigned to Moshanir, while other lots were awarded to leading international consultancy firms
•    Moshanir received an appreciation certificate from the client for the quality of services provided