Development of Comprehensive Engineering and Design Standards for Power Transmission Lines in Iran

Development of Comprehensive Engineering and Design Standards for Power Transmission Lines in Iran

Period 1995–2005
Client Tavanir Company
Stage Final delivery

Technical Specifications

•    Preparation of comprehensive design standards and technical/executive guidelines for power transmission lines
•    Drafted and reviewed through multiple sessions at Tavanir
•    Incorporation of corrective feedback from regional electricity companies and Ministry of Energy consultants
•    Finalized and published as official Design and Execution Standards for Power Transmission Lines

Moshanir responsibility:

•    Recognized as the most experienced consultant in Iran’s power industry
•    Selected unanimously during the first specialized seminar on transmission lines, organized by Mazandaran Regional Electricity Company in Babolsar
•    Entrusted with the responsibility of developing the national standards

Key Achievements

•    For the first time in Iran’s power industry, comprehensive design and execution standards for transmission lines were developed
•    Standards consolidated over 30 years of technical expertise and experience accumulated by Moshanir
•    Made available for use by all transmission line engineers across the electricity sector, establishing a unified reference framework