Period
2006–2007
Client
Iran Power Development Organization – Ministry of Energy, Iraq
Location
Khuzestan Province (Iran), Shalamcheh border, Hartha (Iraq)
Stage
Final delivery
Technical Specifications
• Total route length: 25.3 km
• Single circuit section: 24.5 km
• Double circuit section: 0.8 km
• Two conductors per phase
• Lattice steel towers
• 54 single circuit suspension towers and 34 angle towers
• Insulators: silicone rubber type
• Shield wire: 7NO.8 9
• Optical ground wire (OPGW): 10.5 mm
• Conductor type: Curlew
Moshanir responsibility:
Moshanir was responsible for:
• Project design
• Preparation of tender documents
• Execution of tender procedures
• Contracting with selected contractors
• Supervision of equipment testing
• Preparation of technical and executive guidelines
• Supervision of construction and commissioning