Aghareb Parast – Eslamabad 230 kV Cable Tunnel and Duct Bank

Aghareb Parast – Eslamabad 230 kV Cable Tunnel and Duct Bank

Period 2008–2013
Client Esfahan Regional Electricity Company
Location Esfahan City
Stage Provisional delivery (contractor currently addressing minor deficiencies)

Technical Specifications

•    Tunnel excavation using the NATM method (New Austrian Tunneling Method)
o    Manual excavation between ventilation shafts
o    Initial stabilization including steel frame installation, mesh reinforcement, and shotcrete application
o    Lining operations: rebar installation, formwork, and concrete casting
o    Tunnel drainage system implemented after initial stabilization
•    Construction of electrical chambers and absorption wells as planned

Moshanir responsibility:

Moshanir was responsible for:
•    Procurement of equipment
•    Installation and commissioning under Management Contract (MC) framework
•    EPC contract type (Engineering, Procurement, and Construction)