Period
2008–2013
Client
Esfahan Regional Electricity Company
Location
Esfahan City
Stage
Provisional delivery (contractor currently addressing minor deficiencies)
Technical Specifications
• Tunnel excavation using the NATM method (New Austrian Tunneling Method)
o Manual excavation between ventilation shafts
o Initial stabilization including steel frame installation, mesh reinforcement, and shotcrete application
o Lining operations: rebar installation, formwork, and concrete casting
o Tunnel drainage system implemented after initial stabilization
• Construction of electrical chambers and absorption wells as planned
Moshanir responsibility:
Moshanir was responsible for:
• Procurement of equipment
• Installation and commissioning under Management Contract (MC) framework
• EPC contract type (Engineering, Procurement, and Construction)