Period
2000–2004
Client
Sistan & Baluchestan Regional Electricity Company
Location
Sistan & Baluchestan Province
Stage
Final delivery
Technical Specifications
• 150 km double circuit 230 kV transmission line
• Designed for areas with light to medium load demand
• Conductor type: Canary AW
• Shield wire: OPGW 10.5 mm
• Composite insulators
• Tower types: T2 60, T2 30, HS2 10, LS2 3
Moshanir responsibility:
Moshanir was responsible for:
• Procurement of equipment
• Installation and commissioning under Management Contract (MC) framework
• EPC contract type (Engineering, Procurement, and Construction)
Key Achievements
• At the time, the project was considered one of the best in the Ministry of Energy portfolio due to:
• Minimal cost and high quality in tower design and route selection
• First experience in Iran of executing a transmission line project under the EPC contract model