Tehran Refinery Medium-Voltage Power Network

Tehran Refinery Medium-Voltage Power Network

Period July 2002 – December 2002
Client Tehran Oil Refining Company
Location Tehran Province
Stage Final Handover

Technical Specifications:

•    The Tehran Refinery operates two power plants (old and new) at a voltage level of 6 kV, isolated from the national grid.
•    These plants supply various refinery loads, the majority of which are electric motors.

Moshanir responsibility:

Execution of system studies including:
•    Load flow analysis
•    Short-circuit studies
•    Protective coordination
•    Motor starting analysis
•    Network stability assessment

Special Achievements

As part of this project, new relay settings for the refinery were calculated and, under Moshanir’s supervision, implemented by the contractor on the existing relays.