Sangtoudeh (2) Dam and Hydropower Plant

Sangtoudeh (2) Dam and Hydropower Plant

Period 2006–2013
Client Ministry of Energy and Industries of Tajikistan
Location Southwestern Tajikistan, near Ghazal Guzar village (approximately 180 km south of Dushanbe)
Stage Completion of construction works; currently in the phase of resolving operational deficiencies

Technical Specifications

•    Earthfill dam with central clay core, run of river type
•    Crest length: 385 meters
•    Dam height from riverbed: 31.5 meters
•    Total reservoir volume: 66.5 million cubic meters
•    Surface power plant type
•    Number of units: 2 (each with a capacity of 110 MW)
•    Design water head: 19 meters
•    Design discharge per unit: 516 cubic meters per second
•    Average annual energy generation: 994 GWh

Moshanir Responsibility:

Moshanir Company was responsible for preparing and approving the Work Breakdown Structure (WBS) of the project, monitoring progress reports of construction activities, and controlling the periodic statements submitted by Sangab Company.