Period
July 2004
Client
Khuzestan Water and Power Authority
Location
19 km northeast of Behbahan, Iran
Stage
Installation and commissioning phase
Technical Specifications
• Underground hydropower plant, continuation of Phase I
• Installation of four turbine generator units, each with a capacity of 250 MW
Moshanir Responsibility:
Moshanir Company was responsible for:
• Reviewing, controlling, and approving electromechanical documents
• Providing high level supervision
• On site supervision of equipment installation