Period
2012–2016
Client
Khuzestan Water and Power Authority
Location
Khuzestan Province, Iran
Stage
Phase II studies
Technical Specifications
• Catchment area: approximately 864 km²
• Average annual inflow to reservoir: 685 million m³
• Primary purpose: Hydropower generation
• Concrete dam with a height of 135 meters
• Total reservoir volume: 600 million m³
• Hydropower plant with two generating units
• Installed capacity: 72 MW
• Average annual energy generation: 184 GWh
Moshanir Responsibility:
Moshanir Company was responsible for conducting Phase II studies and preparing tender documents.