Period
1994–2010
Client
Khuzestan Water and Power Authority
Location
: 55 km northeast of Masjed-Soleyman and 49 km from the Karun River estuary
Stage
Final delivery
Technical Specifications
• Total length of constructed tunnels: 3,300 m
• Combined height of underground vertical shafts: 600 m
• Total length of grouting and drainage galleries: 1,032 m
• Powerhouse cavern dimensions: 49 × 26 × 145 m بررسی شود)
• Total excavation volume: 460,000 m³
• Total concrete placement: 200,000 m³(بررسی شود)
• Total reinforcement: 17,000 tons
• Total length of cutoff curtain: 30,000 m
• Total length of drainage curtain: 10,000 m
• Four vertical Francis turbine-generator units, each rated at 250 MW
Moshanir Responsibility:
Moshanir was responsible for the design and supervision of all civil works related to the powerhouse and auxiliary structures, including the powerhouse cavern, T.O.Y facilities, Tunnel No. 7, intake water supply system, tailrace, as well as continuation of works on the 400 kV switchyard.