Shariati Combined Cycle Power Plant – Fuel Storage Tanks

Shariati Combined Cycle Power Plant – Fuel Storage Tanks

Period 2011–2018
Client Thermal Power Plants Holding Company (Iran Power Development Organization)
Location Mashhad City
Stage Commissioned and permanently delivered

Technical Specifications

•    Construction of two fuel storage tanks, each with a capacity of 15,000 m³
•    Total additional storage capacity: 30,000 m³

Moshanir Responsibility:

Moshanir provided engineering services for detailed design, overall supervision, and site supervision for the construction of two diesel fuel storage tanks, each with a capacity of 15,000 m³, at Shariati Combined Cycle Power Plant.

Key Achievements

•    In response to the shortage of liquid fuel at Shariati Combined Cycle Power Plant, the addition of 30,000 m³ diesel storage capacity to the existing tanks ensured greater reliability in the operation of gas turbine units during interruptions in natural gas supply.