Shirvan Combined Cycle Power Plant Project

Shirvan Combined Cycle Power Plant Project

Period 2009–2020
Client Thermal Power Plants Holding Company (Iran Power Development Organization)
Location 12 km southeast of Shirvan city
Stage • Steam Unit 1 synchronized on September 28, 2017 and provisionally delivered on May 10, 2018 • Steam Unit 2 synchronized on July 21, 2019 and provisionally delivered on October 23, 2019 • Steam Unit 3 currently under construction and implementation

Technical Specifications

•    Existing plant includes six gas turbine units of type V94.2, each rated at 159 MW
•    Project objective: construction of three steam turbine units, each rated at 160 MW
•    Conversion of the gas turbine units into a combined cycle configuration

Moshanir Responsibility:

This project is part of the national program for 22 combined cycle units. Moshanir is responsible for providing engineering and supervision services, including design review and adaptation, supervision of domestic equipment manufacturing, project management and control, and site supervision.

Key Achievements

•    Utilization of technical expertise from local and domestic specialists in engineering and equipment manufacturing
•    Main power plant equipment designed and produced by domestic factories and manufacturers