West Karun Power Plant Project

West Karun Power Plant Project

Period 2015–2019
Client Petroleum Engineering and Development Company (PEDEC)
Location 35 km southwest of Ahvaz
Stage Basic design completed for auxiliary projects including gas transmission pipeline, gas pressure reduction station, water transmission line, and water treatment plant , Overall, engineering and site supervision of substations and transmission lines are ongoing. The first gas turbine unit of the power plant was synchronized on July 31, 2019

Technical Specifications

•    Project consists of one combined cycle block including two gas turbine units and one steam turbine unit
•    Nominal capacity: approximately 500 MW
•    Auxiliary projects include gas supply, water supply to the power plant, and construction of 230 kV transmission lines and substations

Moshanir Responsibility:

In the BOO (Build–Own–Operate) section of the power plant construction, Moshanir’s main responsibilities include overall supervision of engineering and project execution within the framework of the ECA contract for West Karun Power Plant
•    In the auxiliary projects, Moshanir carried out preliminary studies and basic design, prepared scope of work and tender documents, cooperated with the client in tendering processes, assisted in contractor selection, and provided site and overall supervision