Period
2006–2015
Client
Thermal Power Plants Holding Company
Location
Kilometer 40, Tehran–Garmsar Road
Stage
Commissioned and permanently delivered
Technical Specifications
• Composed of 12 gas turbine units and 6 steam turbine units
• Total installed capacity: 2,880 MW
• Primary fuel: natural gas
• Secondary fuel: diesel oil
• Cooling system for steam units: Heller type
Role of Moshanir Company
Moshanir provided engineering and overall supervision services, including design review and adaptation, supervision of domestic equipment manufacturing, project management and control, and site supervision.
Key Achievements
• Optimal utilization of energy derived from fuel consumption
• Increased generation capacity and efficiency of the power plant
• Application of domestic technical expertise in design and engineering
• Strengthening domestic manufacturing capability for major power plant equipment