Period
2011–2012
Client
Atrin Wind Turbine Development Company
Stage
Preliminary studies
Technical Specifications
• Establishment of manufacturing plants for wind turbine equipment
• Planned annual production capacity: 250 units in the initial phases
• Facilities to include blade manufacturing, tower fabrication, and nacelle assembly for wind turbines ranging from 1.5 MW to 3 MW
Role of Moshanir Company
Moshanir prepared the feasibility study and business plan for the establishment of wind turbine equipment manufacturing plants, intended for submission to the bank.