Construction of Wind Turbine Equipment Manufacturing Plants

Construction of Wind Turbine Equipment Manufacturing Plants

Period 2011–2012
Client Atrin Wind Turbine Development Company
Stage Preliminary studies

Technical Specifications

•    Establishment of manufacturing plants for wind turbine equipment
•    Planned annual production capacity: 250 units in the initial phases
•    Facilities to include blade manufacturing, tower fabrication, and nacelle assembly for wind turbines ranging from 1.5 MW to 3 MW

Role of Moshanir Company

Moshanir prepared the feasibility study and business plan for the establishment of wind turbine equipment manufacturing plants, intended for submission to the bank.