Period
2010–2012
Client
Atrin Wind Turbine Development Company
Location
Provinces of Sistan & Baluchestan, Khorasan Razavi, and Semnan
Stage
Completed
Technical Specifications
• Development of wind farms with a total scale of 500 MW each
• Utilization of wind turbines ranging from 1.5 MW to 2.5 MW capacity
Role of Moshanir Company
Moshanir was responsible for:
• Identification of suitable sites for wind farm construction
• Conducting technical and economic feasibility studies in accordance with the requirements of the Renewable Energy Organization of Iran (SANA)
• Performing electrical studies and obtaining approval for grid connection design
Key Achievements
• Comprehensive assessment of wind energy potential in multiple provinces
• Establishment of feasibility and grid integration framework for large-scale wind power development in Iran
• Contribution to the strategic expansion of renewable energy capacity in the country