2000 MW Wind Power Plant Project

2000 MW Wind Power Plant Project

Period 2010–2012
Client Atrin Wind Turbine Development Company
Location Provinces of Sistan & Baluchestan, Khorasan Razavi, and Semnan
Stage Completed

Technical Specifications

•    Development of wind farms with a total scale of 500 MW each
•    Utilization of wind turbines ranging from 1.5 MW to 2.5 MW capacity

Role of Moshanir Company

Moshanir was responsible for:
•    Identification of suitable sites for wind farm construction
•    Conducting technical and economic feasibility studies in accordance with the requirements of the Renewable Energy Organization of Iran (SANA)
•    Performing electrical studies and obtaining approval for grid connection design

Key Achievements

•    Comprehensive assessment of wind energy potential in multiple provinces
•    Establishment of feasibility and grid integration framework for large-scale wind power development in Iran
•    Contribution to the strategic expansion of renewable energy capacity in the country