Khaf 2.5 MW Wind Turbine Project

Khaf 2.5 MW Wind Turbine Project

Period Starting October 2012
Client Atrin Iranian Wind Power Plants Company
Location Khaf County
Stage Ongoing

Technical Specifications

•    Installation of one wind turbine with a capacity of 2.5 MW

 

Role of Moshanir Company

Moshanir was responsible for:
•    Design of the turbine foundation
•    Supervision of foundation construction
•    Supervision of electrical works outside the turbine
•    Repairs and commissioning of the turbine

 

Key Achievements

•    Contribution to the development of wind energy infrastructure in Khaf region
•    Strengthening domestic expertise in turbine installation, foundation engineering, and electrical integration