• Geothermal power plant with a planned generation capacity of 25 MW
Moshanir was responsible for:
• Design and supervision of access road construction to the drilling site
• Establishment of 5 drilling sites
• Construction of a 5,000 m³ water storage tank
• Two pumping stations
• Covered warehouse facilities
• Drilling of 11 geothermal wells
• Execution of geophysical tests and studies
• Flow testing of geothermal wells
• Construction of Alvenius pipeline system
• Well logging operations