• Two wind turbines, each rated at 2 MW (total capacity: 4 MW)
Moshanir was responsible for:
• Reviewing and approving the design
• Supervising the construction of turbine foundations
• Supervising electrical works outside the XEMC turbines (two 2 MW units)