Armenia Wind Power Plant

Armenia Wind Power Plant

Period 2003–2005
Client Sanir Company
Location Republic of Armenia, Pushkin Pass highlands, north of Vanadzor city
Stage Permanently delivered

Technical Specifications

•    Wind farm consisting of 4 wind turbines, each rated at 660 kW
•    Includes transformers, access roads, site development, and electrical works outside the turbines

 

Role of Moshanir Company

Moshanir was responsible for:
•    Supervision of wind measurement operations at Pushkin Pass highlands
•    Preparation of technical and economic feasibility studies for wind farm construction
•    Guidance of wind measurement operations in the Sisian region
•    Design of foundations and access roads
•    Supervision of civil works, construction, installation, commissioning, and provisional delivery of wind turbines

 

Key Achievements

•    Successful implementation of an international wind energy project in Armenia
•    Contribution to regional renewable energy development through feasibility studies and technical supervision