• Wind farm consisting of 4 wind turbines, each rated at 660 kW
• Includes transformers, access roads, site development, and electrical works outside the turbines
Moshanir was responsible for:
• Supervision of wind measurement operations at Pushkin Pass highlands
• Preparation of technical and economic feasibility studies for wind farm construction
• Guidance of wind measurement operations in the Sisian region
• Design of foundations and access roads
• Supervision of civil works, construction, installation, commissioning, and provisional delivery of wind turbines