Manjil Wind Power Plant

Manjil Wind Power Plant

Period Starting December 2005
Client Renewable Energy Organization of Iran (SANA)
Location Manjil region and scattered sites across the country
Stage Ongoing

Role of Moshanir Company

Moshanir was responsible for:
•    Layout planning of wind farms at Harzevil and Siyahpoosh sites
•    Estimation of extractable energy from the wind farm
•    Design studies of the internal 20 kV electrical network
•    Preliminary studies and design of access roads, culverts, turbine and transformer foundations, and guardhouses
•    Supervision of geological testing
•    Preparation of general layout maps, steel structures, bridges, and culverts
•    Supervision of civil and electrical works outside the turbines
•    Construction, installation, commissioning, and provisional delivery of wind turbines

 

Key Achievements

•    Establishment of Iran’s first large-scale wind farm cluster in Manjil region
•    Development of technical expertise in wind farm layout, civil infrastructure, and electrical integration
•    Strengthening renewable energy capacity through phased implementation across multiple sites