• Currently consists of 2 gas turbine units of type V94.2
• Nominal capacity: 162 MW each under ISO conditions
• Efficiency: 33.8%
• Fuel: natural gas (primary) and diesel oil (secondary)
Moshanir’s responsibilities included:
• Identification of defects after installation and proposing corrective solutions
• Supervision of project handover from the construction contractor to the O&M (Operation & Maintenance) contractor
• Oversight of plant operation