• Provision of engineering services and supervision for:
• Major overhauls
• Mid-term and routine maintenance
• Supervision of operation of Units 1 to 6 of Ramin Power Plant
Moshanir was responsible for:
• Reviewing reports and analyzing unit outages
• Determining the contribution of each equipment item to overall system failures
• Conducting studies to identify and resolve defects
• Defining production quality indicators
• Addressing environmental, safety, painting, coating, and chemical issues
• Reviewing industrial wastewater management