• Provision of consultancy and supervision services for the operation of:
• 4 steam units
• 2 gas turbine units
Moshanir was responsible for:
• Establishing a project control system for suppliers
• Preparing a CPM (Critical Path Method) schedule for the overall repair process
• Preparation and organization of technical documentation
• Supervision of maintenance and operation procedures
• Oversight of technical protection, safety, and health measures
• Conducting periodic reviews and ensuring compliance of executed works with drawings, technical specifications, and standards