Technical Specifications
- Optimal normal water level: 183 m above sea level
- Installed capacity: 120 MW
- Run-of-river base operation with annual generation capacity of 490.7 GWh
- Concrete dam height: 55 m
- Crest elevation: 193 m
- Riverbed elevation: 138 m
- Crest width: 7 m
- Crest length: 374 m
- Water diversion system during construction: one horseshoe-shaped tunnel on the right bank, diameter 12 m, length 424 m
Role of Moshanir Company
Moshanir provided consultancy services to the client during the initial study phase, including:
- Identification stage
- Justification stage
Key Achievements
- Comprehensive feasibility assessment of hydropower potential on the Dez River
- Establishment of technical and economic framework for dam and run-of-river power plant development