×
En
|
فارسی
23 February 2026 -10:55:26
Introduction
Introduction of the Company
Board of Directors
Management
Perspectives and Values
Policy Statement
Human resource
Performance Statistics
Organization Chart
Infrastructure
Projects
Energy
Transmission and Power Distribution
Water
Building
Environment
Transportation
Education
Educational News
Specialized Courses
News
Contact Us
Achievements
Certifications
Membership
Home
Projects
Energy
Masjed Soleyman Dam and Hydropower Plant
Energy
Transmission and Power Distribution
Water
Building
Environment
Transportation
Masjed Soleyman Dam and Hydropower Plant
Period
1995–2010
Client
Iran Water and Power Resources Development Company
Location
25.5 km northeast of Masjed Soleyman city
Stage
The dam was impounded in 2000. Power plant units were commissioned in 2002–2003, and final completion and minor works continued until 2010.
Technical Specifications
Constructed on the Karun River
Rockfill dam with a clay core
Height from foundation: 177 m
Equipped with 5 radial spillway gates, discharge capacity: 23,000 m³/s (PMF)
Power plant includes 4 turbine-generator units, each rated at 250 MW
Role of Moshanir Company
Moshanir participated as a partner in providing all engineering services, including:
Identification stage
Phase I (conceptual design)
Phase II (basic design)
Phase III (detailed design and implementation support)
Key Achievements
One of the largest hydropower projects in Iran, contributing significantly to the country’s electricity generation capacity
Strengthened expertise in large-scale dam engineering and hydropower development
Enhanced flood control and water management on the Karun River
×
share
×
copy
facebook
twitter
linkedin
telegram
whatsapp