En
|
فارسی
23 February 2026 -10:55:08
Introduction
Introduction of the Company
Board of Directors
Management
Perspectives and Values
Policy Statement
Human resource
Performance Statistics
Organization Chart
Infrastructure
Projects
Energy
Transmission and Power Distribution
Water
Building
Environment
Transportation
Education
Educational News
Specialized Courses
News
Contact Us
Achievements
Certifications
Membership
Home
Projects
Energy
Shahid Beheshti Power Plant – Loshan
Energy
Transmission and Power Distribution
Water
Building
Environment
Transportation
Shahid Beheshti Power Plant – Loshan
Period
2010–2013
Client
Gilan Regional Electricity Company
Location
Manjil city
Stage
Ongoing
Technical Specifications
Supervision of design, installation, and commissioning of the Burner Management System (BMS)
Conversion of boiler burners in Unit 2 to tri-fuel capability
Role of Moshanir Company
Moshanir was responsible for:
Reviewing all design documents and drawings related to the BMS
Optimization of the initial design scheme
Reviewing documents related to modifications and tri-fuel burner conversion
Supervision of procurement activities
Preparation of technical reports
Supervision of installation, commissioning, and operation
Key Achievements
Increased boiler efficiency
Easier operation and enhanced safety of the boiler
Utilization of burners capable of operating on three types of fuel
Improved flame distribution and extended lifetime of boiler tubes
Environmental parameter control through the BMS
Fuel consumption savings
Prevention of any gas leakage
×