Shahid Beheshti Power Plant – Loshan

Shahid Beheshti Power Plant – Loshan

Period 2010–2013
Client Gilan Regional Electricity Company
Location Manjil city
Stage Ongoing

Technical Specifications

  • Supervision of design, installation, and commissioning of the Burner Management System (BMS)
  • Conversion of boiler burners in Unit 2 to tri-fuel capability

 

Role of Moshanir Company

Moshanir was responsible for:

  • Reviewing all design documents and drawings related to the BMS
  • Optimization of the initial design scheme
  • Reviewing documents related to modifications and tri-fuel burner conversion
  • Supervision of procurement activities
  • Preparation of technical reports
  • Supervision of installation, commissioning, and operation

 

Key Achievements

  • Increased boiler efficiency
  • Easier operation and enhanced safety of the boiler
  • Utilization of burners capable of operating on three types of fuel
  • Improved flame distribution and extended lifetime of boiler tubes
  • Environmental parameter control through the BMS
  • Fuel consumption savings
  • Prevention of any gas leakage