MESHKIN SHAHR GEOTHERMAL POWER PLANT
PERIOD: 2007 – 2015
EMPLOYER: Renewable Energy Organization of Iran
TECHNICAL SPECIFICATIONS: 25 MW Geothermal Power Plant
LOCATION: Northern slopes of Mount Sabalan
STAGE: Drilling of 11 wells and construction of a 5 MW Pilot Power Plant
MOSHANIR’S ROLE: Designing and supervision on construction of access road to drilling site, construction of 5 drilling sites, construction of 5000 m3 water storage tank, two pumping stations, indoor warehouse, drilling of 11 geothermal wells, performance of geo-physical tests and studies, geothermal well flow testing, construction of Alvenius pipe line, and well logging.
SPECIAL ACHIEVEMENTS: This power plant is the first geothermal power plant in Iran which aims to use renewable energy as an alternative source of power supply.