MASJED SOLEYMAN DAM AND POWER PLANT
PERIOD:1995 – 2010
EMPLOYER: Iran Water and Power Resources Development Company
TECHNICAL SPECIFICATIONS: This dam is on Karun river, it is a clay core rockfill dam, and 177 m high at base. It has 5 radial spillway gates with an inflow of 2300 m3/s (PMF). The power plant consists of four 250-MW turbine generators.
LOCATION: 25.5 km away from northeast of Masjed Soleyman town
STAGE: Masjed Soleyman Dam was impounded in 2000, and power plant units were connected to the national grid between 2002–2003, minor and complementary work of the project lasted until 2010.
MOSHANIR’S ROLE: Moshanir has performed all phases of engineering services including reconnaissance, phases 1, 2 and 3 based on a joint venture agreement.