VIBRATION MONITORING IN 63 kV SUBSTATION ENVIRONMENT OF DOROUD CEMENT COMPANY

PERIOD: May – November, 2008

EMPLOYER: Bakhtar Regional Electric Company

TECHNICAL SPECIFICAITONS: Commissioning of 63 kV substation of Doroud Cement Company after construction was not possible due to environmental vibrations of the company’s vibrating machines. Moshanir, in form of a project for Bakhtar Regional Power Company, provided some appropriate solutions to reduce the vibrations in order to enable the Employer to operate the said substation.

LOCATION: Doroud cement company

STAGE: Completed

MOSHANIR’S ROLE: Identification of the existing conditions through collection of technical documents regarding vibration producing devices, soil mechanical and dynamic properties of the area, dynamic characteristics of the considered equipment and their foundations, control building drawings, and other necessary documents, as well as performance of tests to measure and assess the amount and characteristics of the vibrations transmitted to the substation, equipment modeling and performance of required analyses to investigate the impacts of vibrations on the considered equipment.

Back to previous page
More Info:

Masoud Sadeghi

Tel: +9821-84782170

E-mail: ma.sadeghi@moshanir.co